Egypt

Renewable energy certificates in Egypt

For sites in Egypt, credible renewable claims come from I-RECs issued for Egyptian solar, wind and hydro plants. ecoVera sources them, settles the transfer and retires them in your name.

Egypt's renewable supply is growing

Egypt has a single national grid, managed by the Egyptian Electricity Transmission Company. Solar in the south, wind along the Gulf of Suez and hydro at Aswan all feed it. I-RECs from these plants let companies in Egypt prove the renewable share of the electricity they use.

9.5 GWinstalled renewable capacity
11.2 GWplanned by the end of 2026
30+ GWplanned by 2029
45%renewables share target by 2028
3.5 GW Solar3.03 GW Wind2.98 GW Hydro

Figures as of July 2026.

Main renewable regions. Hover a point for details. Not a list of ecoVera's suppliers.
  • Benban solar park, Aswan: One of the largest solar parks in Africa
  • Aswan High Dam: Egypt’s largest hydro plant
  • Gulf of Suez wind corridor: Egypt’s main wind region, including Zafarana and Ras Ghareb
  • Sharm El-Sheikh, South Sinai: Solar, including a 20 MW plant that began operating in 2022
  • Greater Cairo: Demand centre
  • Alexandria: Demand centre

Why the market matters

A credible claim comes from the same market where you use the electricity. For sites in Egypt, that means I-RECs from plants in Egypt. Try both options.

Your market
Plant
I-REC
Your sites
Counts for RE100 and GHG Protocol reporting.
01

The same-market rule

RE100 and the GHG Protocol expect certificates from your market of use.

02

Every market, one partner

We source I-RECs in each market where you operate.

03

One evidence pack

Statements from every market roll up into group reporting.

Built for every sector

Any company with electricity consumption in Egypt may have a use for appropriately sourced I-RECs. Select a sector to start an enquiry.

Frequently asked questions

Short answers to what companies ask us most.

Can companies in Egypt use I-RECs?

Yes. Companies with electricity consumption in Egypt can use I-RECs issued for renewable plants in Egypt to support market-based Scope 2 reporting, CDP responses and RE100 claims.

Why should certificates come from Egypt?

RE100 and the GHG Protocol expect certificates from the same market where the electricity is consumed. For sites in Egypt, that means certificates from plants connected to Egypt’s grid. Imported certificates do not count.

Where does Egypt’s renewable supply come from?

Mainly solar in Upper Egypt, including the Benban solar park in Aswan, wind along the Gulf of Suez, and hydro at the Aswan High Dam. Installed renewable capacity reached about 9.5 GW in mid-2026 (3.5 GW solar, 3.0 GW wind and 3.0 GW hydro), with 11.2 GW planned by the end of 2026.

Which sectors in Egypt buy I-RECs?

Any company with electricity consumption may have a use for them, including telecom, manufacturing, food and beverage, real estate, banking and healthcare.

ecoVera

Your partnerfor Net Zero.

One grid. Two sides. Every MWh traced.

Let's talk

Tell us what you need

I would like to